Showing posts with label project. Show all posts
Showing posts with label project. Show all posts

Wednesday, October 14, 2026

Day 288 of 2026

I'm behind on my sock for my KAL with M, 
but I am going to stop the pattern here 
and do the forethought heel. 
This will help me determine when to start the toe. 
I don't think it is far away.


 

Tuesday, October 6, 2026

Day 280 of 2026

I have met the first goal for this sock KAL with the exception of 
placing a waste yarn for a future heel. 
I'll do that tomorrow when I am able to make sure I am doing it properly. 
Everything about this pair of socks is new to me 
so I expect a huge learning curve and two socks 
that may or may not be similar in any way.

 

Monday, October 5, 2026

Day 279 of 2026

Time to change color, but it wasn't wound yet. 
I thought today was the target date for the first stage, 
but it is really tomorrow. 

 

Sunday, October 4, 2026

Day 278 of 2026

M and I have set a schedule and have started our knit along. (KAL) 
I have completed more than this but got caught up in a question
 about the row I was working on and didn't figure it out in time
 to get a picture for today. 
My hope is to be able to stick to our schedule
 and have a picture of a much further along sock tomorrow.

 

Wednesday, September 30, 2026

Day 274 of 2026

Finished. 
The Puffy Checks Socks are blocked and ready to be worn. 
I can now get ready for the knit-along with M 
without feeling guilty about starting another pair of socks.
I started posting about these socks in January 
as I was hoping for a pair of Valentine's Day socks, 
hence the vague heart formation for the picture. 
Feel free to go look at all the related posts about these socks 
which are under the label "the puffy checks socks."

 

Friday, September 25, 2026

Day 269 of 2026

My fast finish is improving. 
I completed the foot of sock number two last night,
 and then my needles that were supposed to arrive tomorrow
 arrived today. 
I was able to start and finish the first toe with the new needles 
tonight during the Indiana football game 
with the exception of the grafting.
 If all goes well, I should be done with this pair of socks
 sometime this weekend.


 

Monday, September 21, 2026

Day 265 of 2026


Well, my fast finish is not going as quickly as I had hoped. 
I have been having trouble lately 
with stitches dropping off the end of my needle. 
Once I notice it, it takes quite a while to fix 
as the pattern is not easy to decipher
 when the stitch continues to unravel. 
I have tried to use the 9" circular but my hands cramp
 making it impossible to proceed with that method. 
I am not a fan of magic loop knitting but I may try two circulars. 
I think that may stop the dropped stitches but not bother my hands. 
I need to order several needles to finish this pair
 and to be ready for the first SAL pair M and I will be starting soon.

 

Thursday, September 17, 2026

Day 261 of 2026

I finished cutting out a new quilt today. 
It has been my nap time cutting project for a couple weeks now. 
The stack in the back will need to be sorted and put away. 
To the right of the fabric stack is my colorful pouf. 
That's where the unusable bits are going.





 

Wednesday, September 16, 2026

Day 260 of 2026

It's time to bring the red socks back out. 
I think the last time I posted about them here was in May. 
I am at the straight foot part of the second sock. 
I am motivated to get them done
 so I can begin an informal sock along (SAL) with M. 
I think I'm going to give myself
 a minimum number of rows or repeats
 to do each day for a fast finish.

 

Tuesday, September 8, 2026

Day 252 of 2026

I can't really call this done yet as you can see 
I still have ends to weave in, 
but I did get the fancy bind off done today.

 

Monday, August 31, 2026

Day 244 of 2026

I just finished the second row
 of my two row repeat of this blanket
 only to realize 
that there is not enough yarn for the next row, 
let alone another repeat. 
I am not too broken up about it though. 
It means I get to start the next color sooner. 

 

Sunday, August 16, 2026

Day 229 of 2026

I was hoping to finish color number 5
 before my cutoff for today's picture. 
I didn't quite make it but only have one repeat (two rows) left.
 I'll finish them before I go to bed. 
I am officially more than halfway done with this blanket.

 

Friday, August 14, 2026

Day 227 of 2026

I have several project bags that have a different project in each. 
It occurred to me today that if I put a small tassel
 of the yarn used in the project on the zipper tab, 
I can grab the right bag without opening it
 or second guessing myself.

 

Tuesday, July 21, 2026

Monday, July 20, 2026

Day 202 of 2026

The shirt came together better today. 
It's ready for buttonholes.

 

Saturday, July 18, 2026

Day 200 of 2026

It's been a while since I've knitted anything. 
My hand has been giving me some pain 
so I thought it best to give it a break. 
Tonight I was able to get color number three finished. 

 

Friday, July 17, 2026

Day 199 of 2026

I want to make Fireball a shirt. 
I bought the pattern and the prescribed amount of fabric. 
I have begun laying out the pattern on the fabric
 according to the diagram. 
No matter how many times I measure the fabric 
and review the pattern layout, 
I keep coming up short. 
I suspect it is a pattern-writing error 
and will look into that at a later time. 
For now Fireball will be getting a short sleeved shirt.

 

Thursday, July 16, 2026

Day 198 of 2026

I finished another sweatshirt pillow cover 
and then moved on this pouf 
which has been waiting for a zipper since last year. 
It has its zipper now and will be filled 
with small bits of threads and unusable fabric scraps. 

 

Wednesday, July 15, 2026

Day 197 of 2026

I only finished one sweatshirt pillow cover today, 
but I have a good idea how to tackle the other three now. 
I should get a good amount of sewing time tomorrow
 so we'll see how far I get.